跳转到内容

雷克瑟姆火车总站

坐标53°03′03″N 3°00′05″W / 53.05083°N 3.00139°W / 53.05083; -3.00139
维基百科,自由的百科全书
雷克瑟姆火车总站

英語:Wrexham Generall
威爾斯語Wrecsam Cyffredinol
Wrexham General railway station
Wrexham General railway station
位置 英国 威尔士 雷克瑟姆郡自治市 雷克斯漢姆
地理坐标53°03′03″N 3°00′05″W / 53.05083°N 3.00139°W / 53.05083; -3.00139
途经线路Shrewsbury–Chester
Borderlands
站台4座
其他信息
车站代码WRX
车站等级英国铁路车站等级 D
历史
启用日期1846年
Rebuilt 1912
Cafe and new platforms opened 2008
Platform 4 and footbridge rebuilt 2011
营运信息
乘客數量
(2018/19)
0.512 million
乘客數量
(2019/20)
0.502 million
乘客數量
(2020/21)
0.128 million
乘客數量
(2021/22)
0.400 million
乘客數量
(2022/23)
0.489 million
登录建筑-II级
评定时间1986年9月5日
參考編碼1855[1]

Wrexham General (威爾斯語Wrecsam Cyffredinol) is the main railway station serving the city of Wrexham, north-east Wales, and one of the two serving the city, alongside Wrexham Central. It is currently operated and mostly served by Transport for Wales, with some additional services provided by Avanti West Coast to London Euston.

The station was first opened in 1846, later becoming part of the Great Western Railway (GWR) network and expanded in 1912. It is one of three railway stations in the central area of the city, one now part of General, named Wrexham Exchange, the other being Wrexham Central. It is the main hub for inter-city services in the area, and as a result 78% of all rail journeys (2006/07) in Wrexham County Borough start or end at the station. It is also a major hub for inter-city services in North Wales.

Until the early 1980s what is now platform 4 of Wrexham General, serving the Wrexham Central – Bidston service, was a separate station: Wrexham Exchange.

历史[编辑]

In 1846 the first steam trains began the Railway Age in Wrexham. The line was originally called The North Wales Mineral Railway and was backed by local businessmen, among whom the developer of the steel works at Brymbo, Henry Robertson, is well known.

There have been two railway station buildings on the site. The first was the original was built by the Shrewsbury and Chester Railway in Jacobean style with Dutch gable pediments. The architect for that station was Mr Thomas Penson of Wrexham, who also designed the Shrewsbury and Gobowen stations. It was built on the edge of Wrexham, then a town which was heavily industrialised with many coal mines and steelworks to attract railway companies.

The second station building was constructed by the Great Western Railway (GWR) in 1912. The company decided the increasing rail traffic needed newer and more efficient facilities so the station was rebuilt to a standardised GWR 'French Pavilion' design, including ornate crestings on the roof "towers". The station design was unique in that it used stonework from the original building instead of standard red brick. It survived the Beeching cuts of the 1960s, as a through route for steel produced in Shotton and wood for the Chirk MDF factory.

On 24 April 1997, a wagon on an empty coal train derailed at a nearby level crossing. The train carried on for a mile into Wrexham General where the wagons scraped up the platform, damaging it and the station canopy.[2] That prompted a massive refurbishing, including new canopies, a jetwash of the blackened sandstone buildings, and platform retiling along all main platforms. The out-of-use bay platform saw no improvements and retained its 1970s lighting until 2008, when it was refurbished by the Welsh Assembly.

The suffix "General" was used by the GWR and later the Western Region of British Railways to differentiate their main stations from others in the area, which belonged to other companies. Following the Beeching axe, Wrexham General remains the only "General" station on the National Rail network, and other "General" stations (including Shrewsbury General and Chester General, which were simply renamed "Shrewsbury" and "Chester" respectively) lost the suffix or (like Cardiff General, the last station to lose the "General" suffix) were re-dubbed as "Central" stations. Because of the continued presence of two stations serving Wrexham, the other being titled Wrexham Central, the "General" suffix was retained.[3]

Until 1967, Wrexham General was served by GWR, latterly BR Western Region, express services between London Paddington and Birkenhead Woodside, which were withdrawn upon the electrification of the West Coast Main Line.

布局[编辑]

雷克瑟姆火车总站拥有4座使用中站台,1站台旁边的两座港湾式站台现已停用。These were used for trains to Barmouth via the Ruabon Barmouth line until the 1960s. Platforms 1 and 2 are on the main Chester to Shrewsbury line, platform 3 being on an island platform opposite 2; and platform 4, until the mid-1980s a separate former Great Central Railway station named Wrexham Exchange, was on the ex-Ellesmere to Bidston line, now the Wrexham to Bidston Borderlands Line. Platform 5, once opposite and on the same route as platform 4, became disused when the line was singled, however in 2008 it has been re-surfaced and is now a private parking space.

  • Platform 1 can accommodate a 10 car train,[4] and is used for long distance southbound intercity passenger services to Shrewsbury, and onwards to Birmingham International (via Telford Central) or Cardiff Central, operated by Transport for Wales, and for services terminating at Wrexham from Chester and London Euston. Due to signalling constraints, trains cannot depart to the north.
  • Platform 2 can accommodate a 10 car train,[4] and is used for regular northbound passenger inter city and regional services to Chester and services onwards to the North Wales Coast line to Holyhead and for services to Manchester Piccadilly via Chester and Runcorn, operated by Transport for Wales. Inter city Services to London Euston (via Chester and Crewe) are also provided on this platform by Avanti West Coast. Due to signalling constraints, trains cannot depart to the south.
  • Platform 3 can accommodate a 7 car train,[4] and was used for regular passenger services to London Marylebone via Shrewsbury, Telford Central and Tame Bridge, operated by Wrexham & Shropshire. This platform is now used by a small number of Borderlands Line passenger services (usually the first northbound and last southbound train each day), for services terminating at Wrexham from Shrewsbury and for freight services changing between the Shrewsbury-Chester line and the Borderlands line. This platform is signalled bidirectionally, so trains can depart either south towards Shrewsbury or north towards Bidston, although no services from Shrewsbury currently depart on the Borderlands line and vice versa. In practice this platform is used for trains terminating from either direction.
  • Platform 4 is located outside the main station canopy and is used for regular branch line passenger services northbound to Bidston, and to Wrexham Central in the opposite direction, operated by Transport for Wales. This platform is signalled bidirectionally, so trains can depart either south towards Wrexham Central or north towards Bidston.


Recent developments[编辑]

The station is currently undergoing a renaissance as a number of new services have been introduced. Since 2005 the station has been a stop of the two hourly Cardiff to Holyhead Transport for Wales service (introduced by previous franchise operator Arriva Trains Wales, which occasionally extends to Llanelli. The two hourly Birmingham service has also been extended to Birmingham International and Holyhead.

In April 2008, Ieuan Wyn Jones AM, the Deputy First Minister for Wales opened a new Wrexham Network Rail depot. It consisted of the refurbishment of two terminal bay platforms to the south of the station for overnight stabling of trains and the construction of a crew depot. The development was opened to coincide with the start of services from Wrexham General to London by Wrexham & Shropshire, who utilised the depot until services to London Marylebone stopped in January 2011.

From February 2009 a cafe has opened on the station in formerly empty office space. In June 2011, construction began on the increased access for disabled people to platform four. The existing footbridge between platforms three and four was removed in preparation for the construction of a new footbridge which includes a lift on Platform four. This obviates the use of the road bridge for disabled access to platform four. The new bridge has been built to modern standards but in a style sympathising with the rest of the station design. The footbridge was installed in a record 12 hours and a timelapse video was shot of the event.

On 20 March 2012 it was announced that sections of the North to South Wales line would be upgraded along the Wrexham section of the line to a total of £46 million worth of improvements. These include redoubling the Wrexham – Chester section, and upgrading sections of the line to allow for 90 mph running throughout. This will allow for an increase in traffic between Wrexham and Chester, including further London services and a possibility of regular services to new destinations. One report has suggested extending the hourly First TransPennine Express HullManchester Piccadilly service to Wrexham via Chester, which would provide a direct service to Manchester, Leeds and Hull. Other suggestions include extending the current hourly Chester – Crewe shuttle service south to Wrexham and north to Manchester (via Manchester Airport).[5] Although the engineering work completed in April 2017, no new developments are anticipated until late 2017 at the earliest.[6]

Transport for Wales have confirmed plans to introduce peak time services to and from Liverpool Lime Street via Chester and Runcorn, along the Halton Curve,[7][8] from May 2019.[9][10]

图片集[编辑]

雷克瑟姆交换站[编辑]

雷克瑟姆交换站(英文全称:Wrexham Exchange railway station,英文简称:Wrexham Exchange)现已与雷克瑟姆火车总站合并,成为雷克瑟姆火车总站4站台。雷克瑟姆交换站启用于1866年5月,位于雷克瑟姆火车总站,但合并前是独立火车站,1981年并入雷克瑟姆火车总站。[11][12][13]


參考資料[编辑]

  1. ^ Template:NHAW
  2. ^ Eight-wagon night smash at Wrexham station. RAIL. No. 304 (EMAP Apex Publications). 7–20 May 1997: 6. ISSN 0953-4563. OCLC 49953699. 
  3. ^ Slater, J.N. (编). Notes and News: Western's last "General". Railway Magazine (London: IPC Transport Press Ltd). July 1974, 120 (879): 361. ISSN 0033-8923. 
  4. ^ 4.0 4.1 4.2 Yonge, John. Jacobs, Gerald , 编. Railway Track Diagrams 4: Midlands & North West 2nd. Bradford on Avon: Trackmaps. March 2005. map 22D [1990]. ISBN 0-9549866-0-1. 
  5. ^ £46m rail improvement scheme for Wrexham lines. North Wales Daily Post. 20 March 2012 [5 January 2015].  参数|newspaper=与模板{{cite web}}不匹配(建议改用{{cite news}}|website=) (帮助)
  6. ^ Williams, Kelly. Wrexham to Chester railway line upgrade finally complete after major delays. 5 April 2017. 
  7. ^ Chancellor announces £10.4m to redevelop Halton Curve rail line. Runcorn & Widnes Weekly News. 3 July 2014 [2014-07-03]. 
  8. ^ Halton Curve to be reinstated with £10.4m upgrade. Chester Chronicle. 3 July 2014. 
  9. ^ New Chester-Liverpool rail service. Cheshire Live. 21 September 2018 [23 September 2018].  参数|newspaper=与模板{{cite web}}不匹配(建议改用{{cite news}}|website=) (帮助)
  10. ^ Rail industry confirms new summer 2019 timetable. 7 March 2019 [11 March 2019]. (原始内容存档于28 March 2019). 
  11. ^ Mitchell, Vic; Smith, Keith. Wrexham to New Brighton: including Connah's Quay and Chester Northgate. Country Railway Routes. West Sussex: Middleton Press. 2013: 地图5. ISBN 978-1-908174-47-5. OCLC 859543196 (英语). 
  12. ^ Disused Stations: Wrexham Exchange Station [已停用火车站:雷克瑟姆交换站]. disused-stations.org.uk. 2017-05-26 [2024-06-22]. (原始内容存档于2023-0521) (英国英语). 
  13. ^ Mitchell, Vic; Smith, Keith. Wrexham to New Brighton: including Connah's Quay and Chester Northgate. Country Railway Routes. West Sussex: Middleton Press. 2013: 图表10. ISBN 978-1-908174-47-5. OCLC 859543196 (英语). 

扩展阅读[编辑]

外部連結[编辑]

Template:Stn art lrnk